    Cmy replied to the thread Line Side Tap Ability.
    Utility solar manager sent the solar inspector out to see what I had. Said the existing CB disconnect, next to meter, was OK but a...
  • C
    Cmy replied to the thread Line Side Tap Ability.
    The utility requires a second disconnect at the inverter end where solar AC goes underground . I could hire an electrician, coordinate...
  • C
    Learning more about 120% rule and load vs line. Where does the ability to tap line side end - at first ocpd? One of my meter feeds is...
  • C
    Cmy replied to the thread Tap vs Breaker.
    Or, the original questions, would a Siemens bolt on pass code in a Homeline? Or if lower cost used Sq D 225a $70 on Amazon, same or...
  • C
    Cmy replied to the thread Tap vs Breaker.
    Sorry tried to change mid thought and deleted while editing original post. Yes, more 150a and 200a available, 150A main as in...
  • C
    Cmy posted the thread Tap vs Breaker in Beginners Corner.
    Running wire for new breaker panel in building where solar is going. Attached 200a panel connects directly to the meter through a...
    • P EAST PANEL OPEN.jpg
  • C
    Cmy replied to the thread 120% Rule Options.
    Looking for least disruptive, code passing, change to get more amps for the inverter's 48a. Easiest changing the dual 100a breaker to...
  • C
    Cmy replied to the thread 120% Rule Options.
    I don't claim to fully understand the 120% rule but one definition referred to the main service panel capacity. I appear to have three...
    • P East Panel.jpg
  • C
    Cmy posted the thread 120% Rule Options in Beginners Corner.
    Discussing grid tied inverters and AC amps out, Hedges wrote about the 120% rule and breaker choices. Liking the Growatt 11.4 grid...
  • C
    Cmy replied to the thread Grid Tied Options?.
    Agree but I pretend I am a good neighbor and not take grid watts from them :). Rewiring the house for a single feed (disconnect and...
  • C
    Cmy replied to the thread Grid Tied Options?.
    Almost. Will raves about S-A 15 and 18kPV quality and 10 year warranty enough so that others seem marginal. Little is lost trying...
  • C
    Cmy replied to the thread Grid Tied Options?.
    Previously robbob suggested another look at the 18kPV manual wiring. It still shows CTs used in all five diagrams. Signature has said...
  • C
    I looked at my steel purlins again and they are 4.5 - 5 ft apart. Which means some panel borders will have one or two trapezoids to...
  • C
    Cmy replied to the thread Grid Tied Options?.
    I have the Square D Q22200NRB next to and fed from the meter. Lots of confusion as the utility specifies external handle, non modular...
    • P SQ D 200A OPEN.jpg
  • C
    Cmy replied to the thread Grid Tied Options?.
    Next door neighbor has what I want, he claims electric bills have only the meter charge (now $27) for the last six years and shows zero...
  • C
    Cmy replied to the thread Grid Tied Options?.
    Thank you for the replies. Hopefully to clarify Hedges - no mention of a grid feed limit until Tariffs where under 50kW get credited...
  • C
    Cmy posted the thread Grid Tied Options? in Beginners Corner.
    Want ~14-15k, 32 to 40 400W panels, on a building distant, but fed, from the meter. Utility (net zero) said grid tied easily approved...
  • C
    But it doesn't actually do that. Pulling the inverter grid disconnect leaves the critical panel running off the inverter batteries...
  • C
    Also R panel, was leaning toward a Rib3. Then I started thinking my steel purlins might hold better than a rib, and added Versa 67 or...