  1. K

    Batrium vs Seplos BMS ?

    Home setup - 16 305Ah cells 16s. Originally with Seplos 200a v3 bms worked fine (actually really well after playing around with settings) and can bus communication to 8kw sunsynk/deye inverter until I tried to upgrade firmware, without decent instructions managed to brick the bms, no pc...
  2. K

    Hello, can anyone help me determine the version Seplos BMS 3.0?

    Anyone know what has changed from 0.4 to 0.6? What happens if you flash V10 with V11?
  3. K

    Exporting dc to adjacent factory.

    This whole idea has now been abandoned as the technical, safety and legal problems are too difficult to overcome. But as a theoretical exercise I have had another thought. Large (100 amp) 3 phase full rectifier feeding DC from factory 1 to grid tie inverter feeding AC to factory 2. C.Ts for...
  4. K

    Exporting dc to adjacent factory.

    In answer to filterguy - batteries will run at aprox 400v. 2stroke forever - the problem with having a separate inverter for factory 2 is that factory one has 5 separate solar arrays on different rooves individual inverters for each one ranging from 50kW to 15kW and all running at different...
  5. K

    Exporting dc to adjacent factory.

    Hi FilterGuy, Answers to questions: 1. Panel to panel is in the order of 50m 2. Factory 1 does not have any batteries but will have 100kWh by the end of the year. 3. Both are 3 phase 440v 4. System design would be for maximum 50kW transfer The voltage drop, either DC or AC would not be a...
  6. K

    Exporting dc to adjacent factory.

    AntronX - I am not keen to go down the route of extra complication of controlling several change over contactors etc. FilterGuy - I was thinking of HV hybrid inverter our end running at about 500v and 100a DC max. Problems I can think might crop up: How to get hybrid inverter to output without a...
  7. K

    Exporting dc to adjacent factory.

    Our factory have a large solar array and for 8 months of the year export a significant proportion of the generated power back to the grid without being paid anything for it. The factory next door use a large amount of power which is all supplied from the grid. We would like to export our surplus...