I recently ordered 2 - 48v 220ah batteries. Almost within minutes of placing my order online Dan sent me a text with a picture of my batteries labeled and ready to ship. It took about 2 days for Fed Ex to get them from Ga to rural Pa.
Hats off to Dan on the way he packs them for shipping. He...
I have 2 Trophy 48v 220ah batteries that I want to stack in the vertical position. Dan at Trophy assured me these can be used without issue in the vertical position.
If I knew how to weld I probably would have just fabricated something out of tube steel. In the end it will serve as a means to...
Moved to a new house in a new state less than 3 months ago. My online account with my electric company provides me with a hourly breakdown of electric usage. I've been watching it closely. After I swap out my electric dryer and hot water heater for propane it looks like I'll max out at 0.7 Kwh...
Hi everyone I'm happy to have found this great resource. Disclaimer: I have no experience with solar or DC power supplies.
I'm going to build a version of Will's DIY 48v off grid power system with the help of son in-law who is a licensed electrician. I'm gathering up all the needed components...
Celsius Network's bankruptcy might have just set a precedent in determining what crypto assets belong to whom when stored on a centralized platform.
https://www.axios.com/2023/01/04/celsius-bankruptcy-earn-accounts
I have an EG4 split phase inverter and I want to run the AC out to a main lug 125A sub panel so I can power up some new branch circuits. But I'd also like to be able to power some critical loads in my main panel when the power goes out. I think it would be easier and cheaper than moving critical...
I have a ramp and small front deck that receives direct sun from sun up until mid afternoon. I estimated that I can put between 6 and 8 400 watt+ panels on the a cantilevered pergola type structure.
My biggest issue is extending the railing posts 3' - 5' so I don't have to take apart the...
I see many recommendations to take the AC out from the inverter to a sub panel that handles critical loads. That would require moving circuits (critical loads) from the main panel to the sub panel, correct?
Is there any reason, other than loss of the inverter ATS function, to not just run the...