I am thinking of installing a critical loads subpanel and some battery storage and later maybe some solar to directly charge the batteries. (I already have a grid-tie 3.5kw solar array with micro inverters). Meanwhile, I'll use wall grid AC in battery EPS mode to keep the batteries topped off...