Quick answers (and contradictory, big surprise) so far. House is a very long basement rancher. Panels at one end of the house, garage at the other. Electron path has to go up 2 floors (panels cantilevered off deck), back down to basement, across 100 ft of house, up garage walls, over ceiling...