Want ~14-15k, 32 to 40 400W panels, on a building distant, but fed, from the meter. Utility (net zero) said grid tied easily approved but hybrid required $$ meter changes, batteries and transfer switch 'near' the meter, not in a separate building. Noted that only two of the 30 or so nearby...