Tulex
Solar Wizard
I had a Generac 10k LP generator attached to my house before installing solar. Removed it during full remodel of the house.
I'm going back and forth between AC coupling and the generator, as I don't see how to have both. One of the considerations is transfer time for the generator. In it's original configuration before solar, it took about a minute for the generator to provide power. So my question is, does the Sol-Ark start the generator and wait for power before it switches over?
I'm going back and forth between AC coupling and the generator, as I don't see how to have both. One of the considerations is transfer time for the generator. In it's original configuration before solar, it took about a minute for the generator to provide power. So my question is, does the Sol-Ark start the generator and wait for power before it switches over?