Hi,
Currently looking to add a battery and hybrid inverter to my existing 11kwh set up. This is my SLD and the DNO have asked for evidence of "G99 protection" in my diagram, does this mean they are looking for a G99 relay on the system or simply looking for me to say on the diagram that the...
Hi,
I have been offered a forklift battery for free - data sheet here https://www.exidegroup.com/eu/sites/default/files/2017-06/GNB_MP_MARATHON_MXMXXREPDF01116_1.pdf but it is a 6 year old 24v 300amp hour battery with an estimated 50% power loss.
I currently have a 3.8 Grid tie system coming...
Ok, so this doesn't seem like a go-er then?
The battery is from my father, from a forklift that is being scrapped (due to other failures) he was seeing if I wanted it rather than doing it that way so it really isn't a case of being lumbered with it.