Thank you. For Option 1, I think a EG4 6000XP would work but not for Option 2 since it does not have any CT input. A Victron or Solark would work. For OPtion 3, I would need a much bigger hybrid inverter that can power all my loads.
Yes, I understand that duration would be limited with one battery hence the provision for a generator. Additional batteries can be added as required in the future.
I already have a system to time shift energy (before and after peak power demands) from the utility. Yes, I will check with the...
I live in Quebec, Canada and I am looking to install a small system with a inverter+battery that can peak shave and also be used during power outages. At the moment, I am not looking to add solar due to limited space and cost. I was looking to start small with a ~6kW inverter (EG4, Victron...