diy solar

diy solar

Search results

  1. B

    pic. on the Mobile solar website

    I was just thinking if the inverter blew the fuse it would also disconnect the scc from the battery bank, but still have solar power going through it, possibly damaging the scc.I too like the simplicity of main power lugs for distribution, and I'm building a stationary system so there's slight...
  2. B

    pic. on the Mobile solar website

    @Will Prowse On the classic 400w system page I have a question on the wiring. The battery wire coming out of the solar charge controller being hooked to the same side of the inline fuse instead of being wired directly to the same stud as the positive battery wire connects, this way if the...
  3. B

    200a bms by daly

    Daly now has a 200 amp separate port bms avail. on aliexpress for $120 usd. would you trust this alone or is it better practice to run a separate battery protect along with a bms. would a 200 amp bms still have the over temp disconnect issue when running a inverter. sorry can't figure out how to...
  4. B

    batt. aH defined

    At 80% of batt. 4800 x .8 = 3840/ 840 is around 4 1/2 hour recharge
  5. B

    batt. aH defined

    Oh yeah 24v x 200ah= 4800w / 840 w expected w from panels is 6 hour recharge and not planning on complete DOD maybe 70/80%
  6. B

    batt. aH defined

    Thanks for the advice. I figured 70% efficiency of the panels. Running 6 total 200 watt panels, 3 in series 2 parallel, for 21.052 x 3 =63.156v and 9.5 x 2 = 19a a total of 1200 watts. 1200 x .7 efficiency = 840 watts. The charge controller was based off max so 1200w / 24v= 50a controller. For a...
  7. B

    batt. aH defined

    first of all, Thank you Will, and i have read many posts on here so thanks to all, great knowledge base here. Will, your video's on youtube have broadened my mind in terms of solar, just a couple of things not so far well defined. 1; I have heard you say before something to the point...
Back
Top