Yes, without the battery and just a GoodWe grid tie inverter, 4.3 years. All systems including $5,500 in costs for racking, installation, engineering and permitting (it's a metro area). If I can get that down, all the better. Note that 4.3y is just the amount of time to recover the numerical...