I've got my system tied into the house with a generator transfer switch that lets me select individual circuits to power, either by grid or solar/generator. So far I've just been casually monitoring system state of charge and adding or removing circuits as needed. It's a modest system, only spec'd to power limited use of the essentials during a grid outage, and so far standard(not limited) usage of several circuits has been enough to use all the power produced.