SuntannedDude
New Member
All, new to this here. So we have a Fronius SYMO GEN24 10Kw hybrid inverter (utilising a Smart Meter TS 65A 3 phase watt meter), connected to 2 parallel BYD HVS lithium battery stack, fed from a 10.62 Kw array.
We want to add in a Growatt MOD 10KTL3-XH Hybrid 3 phase inverter connected to an 8.26Kw array in a 3 phase system house (utilising a Shine Link X monitoring module), each inverter having its own watt meter. I assume these need to be connected in parallel, but how do we get the 2 inverters not to cause conflict with each other & talk to each other? Anyone able to find a simple sketch at all? Anyone able to help at all, would be appreciated.....
We want to add in a Growatt MOD 10KTL3-XH Hybrid 3 phase inverter connected to an 8.26Kw array in a 3 phase system house (utilising a Shine Link X monitoring module), each inverter having its own watt meter. I assume these need to be connected in parallel, but how do we get the 2 inverters not to cause conflict with each other & talk to each other? Anyone able to find a simple sketch at all? Anyone able to help at all, would be appreciated.....