Well, A grade EVE 280 with the same lead time was £120/cell, or with longer lead time about £100. So up to £1500 is a considerable saving and more capacity. As to whether the A>B "downgrade" was worth it, only time will tell, and there is plenty written about that on the forum already...
I...