underdog5004
New Member
Hello,
I have a dual xw+ 5548 system, with batteries, in the shed out back. I plan to connect this to a transfer switch, which would then feed my house, through a subpanel. Currently, the circuit wires land in the main panel. I want to move them to a subpanel, about 15ft away.
I think the wires aren't long enough to reach the sub panel, so I was planning to run them into a junction box, or similar, to splice into a longer run that makes it to the sub panel.
I have 5 or 6 circuits to transfer, all 12-2 romex, 20a breakers.
My question is, is there a better way to extend the existing wires ,other than splicing in a junction box for the home run to the sub panel?
Thank you!
I have a dual xw+ 5548 system, with batteries, in the shed out back. I plan to connect this to a transfer switch, which would then feed my house, through a subpanel. Currently, the circuit wires land in the main panel. I want to move them to a subpanel, about 15ft away.
I think the wires aren't long enough to reach the sub panel, so I was planning to run them into a junction box, or similar, to splice into a longer run that makes it to the sub panel.
I have 5 or 6 circuits to transfer, all 12-2 romex, 20a breakers.
My question is, is there a better way to extend the existing wires ,other than splicing in a junction box for the home run to the sub panel?
Thank you!