So I recently applied for an interconnection agreement with our local power company. It took a few weeks for any type of response, then I was asked to fill out some additional paperwork after they had reviewed my application. I was told they would have a response within 10 business days, then within another 10 business days a crew would be dispatched to inspect the system if it had been approved.
Well, we’re out of the country for the next couple weeks on vacation and I just received the following message via email:
I’m unaware of what a BSET socket is, nor can I find anything on Google. Additionally I’m not exactly sure how they came up with the disconnect switch aspect. My Sol-Ark 15k certainly has an AC disconnect built into it? They couldn’t have really inspected anything, we’re gone and the system is inside my garage, nor did I receive a notice of approval or that someone would be coming by.
Any thoughts or experience here? Not a huge deal, just don’t know what my next steps should be and I’d rather get the ball rolling while we’re away. Thanks!
Well, we’re out of the country for the next couple weeks on vacation and I just received the following message via email:
Technical Correction Notes: Reviewed and Rejected: There needs to be a BSET socket and an AC disconnect between the battery and the transfer switch.” |
I’m unaware of what a BSET socket is, nor can I find anything on Google. Additionally I’m not exactly sure how they came up with the disconnect switch aspect. My Sol-Ark 15k certainly has an AC disconnect built into it? They couldn’t have really inspected anything, we’re gone and the system is inside my garage, nor did I receive a notice of approval or that someone would be coming by.
Any thoughts or experience here? Not a huge deal, just don’t know what my next steps should be and I’d rather get the ball rolling while we’re away. Thanks!