aarshad81
New Member
Hi I am new and building/designing a DIY off grid system
I tried searching for this specific question, but what i find is mostly questions about permitting or not. I am more interested in doing this in a somewhat legal way regarding permitting
I have a current 12.24Kwh system with two tesla power-walls. I am still using lot of energy, as we bought a Tesla Car and AC we added last year.
I want to add a DIY Off-grid Solar system on rest of my roof/garage-roof with EG4 batteries totally separate from utility. Where i would tie in the pool pump and AC. I think i have enough space to add another 8Kw system.
I do want to pull permits but do i really need to involve PGE since i dont want to be kicked from my current NEM2.0. Also depending on who i speak at PGE i am getting conflicting rapports. One rep was even telling me NEM2.0 is based on address and if i have another system on the same address, there is a change in the total system or something which didnt make sense.
How would i best go about this. Also for the permitting process i dont need anything from PGE correct
I tried searching for this specific question, but what i find is mostly questions about permitting or not. I am more interested in doing this in a somewhat legal way regarding permitting
I have a current 12.24Kwh system with two tesla power-walls. I am still using lot of energy, as we bought a Tesla Car and AC we added last year.
I want to add a DIY Off-grid Solar system on rest of my roof/garage-roof with EG4 batteries totally separate from utility. Where i would tie in the pool pump and AC. I think i have enough space to add another 8Kw system.
I do want to pull permits but do i really need to involve PGE since i dont want to be kicked from my current NEM2.0. Also depending on who i speak at PGE i am getting conflicting rapports. One rep was even telling me NEM2.0 is based on address and if i have another system on the same address, there is a change in the total system or something which didnt make sense.
How would i best go about this. Also for the permitting process i dont need anything from PGE correct