Thank you for the 3 phase correction. You are right, did not think of the RSD and optimizers that way. (still looking at defect rate of average optimizers), maybe spending more on RSD is a simple yet lasting solution?You have to install RSD anyway if it is a roof mount, so deferring optimizer decision is not free given that RSD is baked into optimizer.
Relocating the meter will require POCO permission and be subject to added costs/placement restrictions. It is likely not worth considering unless it is overhead service.
It isn’t a 3 phase cable (it is split phase which is Line/Line/Neutral, while 3 phase will be Line/Line/Line/Neutral), and you can compensate for the distance with larger gauge/cost with using aluminum feeder.
You don’t need pairing with batteries for 30% federal tax credit. You need it to have reasonable return on NEM3 though.
Can you clarify "You need it to have reasonable return on NEM3 though." ? I dont plan to sell back power to Util.