If you're being inspected anything over 600 volt will probably require an EE to draw the plans. You could do a 240V step up to 480 volt and then down to 120/240 on the other end. Benefit being the inverter will only see 240 so no imbalance if using a HF inverter. Drawback is the expense of a 600...