I'm trying to setup my Apsmart RSD.... i got the outdoor kit with the transmitter and the power supply but I can't get the power supply to work with my two Sol-Ark 15k's in parallel. How did you setup the power supply on your system? Based on the power supply requirements in the manual and...
If you're not supposed to ground the battery then whey does number six on page 4 of the manual say to make sure the battery and the rack are properly grounded. (see pic) Not to say you're wrong but if you are they should put better instructions in the manual. My batteries are LL V2's
Definitely appreciate the offer for a quick phone conversation... I may take you up on that but I think I'm almost there. I understand that I would have to disconnect and re-connect to each USB connected source of information in the software, not a problem, I'm a nerd from way back. And I...
I'm about to have all of my equipment finally delivered to do my install and was wondering what current users are running grounds for 6 EG4 LL V2 batteries in a rack. In the videos I've seen so far I don't see ground wires connected to the grounding lug on each battery so I'm thinking they are...
Your direct connection to your batteries (not the hub connecting to the splitter) from the Pi.... what are the settings you're using in SA to see the battery data? CAN Protocol in the battery tab?
That's the certification for UL9540A not UL9540 there is a difference. To pass inspection in some municipalities they may require UL9540 certification. https://www.altestore.com/blog/2022/09/what-to-know-about-ul-9540-and-energy-storage-systems/
Markus I’d love to believe there is no warranty issue using both PP and LL V2’s together but the manual says otherwise. And James also said that it’s an issue that needs to be worked out so coms will be functional between PP & LL batteries. See second bullet point under warning in PP manual...
I have a master bus bar in the trough under the two Sol-Arks and everything connect to the bus bar. Battery banks, two groups, the 3 Power Pro's, and the rack of 6 LLV2's. They are all in closed loop. The Chargeverter will soon be connected to the main bus bar as well. Currently its...
My electrician who is assisting in doing my grid and load connections for my 2 Sol-Ark 15k’s in parallel asked me how many amps will the two inverters draw from the grid if there is no PV coming in and charging batteries from the grid connections? For the question I will be charging a rack of 6...
So there are two cables required to do both updates? I have the cable that came with my batteries that I used with BMS tools. Is there another cable other than
EG4 USB Read/Write Cable?
https://signaturesolar.com/eg4-usb-read-write-cable/
I understand I need to do each one separate but...
Ok my fine forum folks I sent the same question to Signature Solar and they sent this reply
“As long as the battery bank is connected to the inverter properly and the inverter is grounded properly, the batteries and the rack themselves do not need any grounding wires as it will all be grounded...
Easy solution found… connect the AC side of the power supply to L1 & L2 of the load terminal on my 15k and works perfect. Ran ground wire as well of course.
I have three EG4 Power Pro batteries and I always top balance my batteries prior to connecting. So I took a pair of battery cables from my PP batteries and added a 2/0 lug on the end without the Amphenol connector. I connected the Amphenol connector to a battery and then connected the 2/0 lug...
Here's a pic from Solar Assistant from todays activity. You can see the spikes in energy from the grid right after the BMS reported a drop in voltage. I have also posted the battery setting used in the inverter.
I've used 48v batteries to charge up my Delta Pro using these cables.
https://www.amazon.com/gp/product/B0BB1X6991/ref=ppx_yo_dt_b_asin_title_o06_s00?ie=UTF8&th=1
https://us.ecoflow.com/collections/accessories/products/solar-charging-cable?variant=40337525375049
How do you plan to charge the...
So I use the same cable for both ports and based on the written docs it’s the same procedure for updating software as the Power Pro batteries as seen in the recent install and commission video recently released.
FYI sometimes it may seem I’m asking a dumb question but most of the time I do it...
I’m about to update the firmware on my LL V2 batteries so they can communicate with the PowerPro batteries and I have a question. I’m following the instructions in the video from SS labeled EG4 PowerPro ESS EG4 18Kpv install and commissioning and they are connecting the RS485 cable to the CAN...
I've been curious about the Ruixu batteries and the 15k as far as coms... you're having no issues at all? Are you off grid or still tied to the grid? If you are tied to the grid are you selling back excess energy when available?
Zero, I’d like to see what weird output readings you’re getting on the load side? Are you splitting the battery com to use Solar Assistant? By the way I also have 6 LLV2 batteries connecting with the three Power Pros and they’re all talking to the Sol-Ark. it took updating the firmware on...
Theoretical question... I have 3 EG4 Power Pro batteries in parallel connected to two Sol-Ark 15k's in parallel and was wondering if in a emergency situation could I disconnect the batteries from my inverter, and connect the EG4 Chargeverter to the internal bus bar in one of the batteries to...