minck
New Member
Hello there,
In our situation there is a roof top solar installation 85000wp connected to a 60kw inverter.
The max delevery to the grid is max. 20kw.
The inverter communicate with the CP measuring device.
When the machines of the workshop are running and using for example 15kw, the inverter delivers 20+15=35kw
The idea was to connect a second solar inverter via a bridge rectifier or vfd+bridge rectifier to this same grid and pump the existing power to another grid adres.
From 3 phases ac directly to a bridge rectifier (semikron skd 100/12) into de DC solar string connection of de solar inverter won't work. The current will be to high.
Is there someone at this forum who tried this before?
Regards Minck
In our situation there is a roof top solar installation 85000wp connected to a 60kw inverter.
The max delevery to the grid is max. 20kw.
The inverter communicate with the CP measuring device.
When the machines of the workshop are running and using for example 15kw, the inverter delivers 20+15=35kw
The idea was to connect a second solar inverter via a bridge rectifier or vfd+bridge rectifier to this same grid and pump the existing power to another grid adres.
From 3 phases ac directly to a bridge rectifier (semikron skd 100/12) into de DC solar string connection of de solar inverter won't work. The current will be to high.
Is there someone at this forum who tried this before?
Regards Minck