I have 24 panels at the moment, the space where they are installed can handle 30. Is it possible to run 10 panels on mppt 1 and mppt 2 and the remaining 4 on mppt 3 until the other 6 panels are sourced? The manual suggests all 3 strings need to have the same amount of panels. Please advise.
10 Panel string Specs with temp coefficient factored in:
4,600 watts 416 volts 13.96 amps
10 Panel string Specs with temp coefficient factored in:
4,600 watts 416 volts 13.96 amps