I recently got net metering installed and frequent power cuts is common here.
My equipment: LuxPower SNA 5k paired with a 51.2V 100Ah battery.
What I want is a grid dependent battery charging current limit,
If the grid is available, I want the battery to charged slowly (or not at all) at the set rate and the rest exported to the grid.
And when the grid is down, I want the battery to resume charging at max Solar utilization.
Reason behind feature request: Sometimes it happens that a power cut happens but the battery is already fully charged thus wasting PV.
@Luxpower_Gilbert You may want to take a look at this.
My equipment: LuxPower SNA 5k paired with a 51.2V 100Ah battery.
What I want is a grid dependent battery charging current limit,
If the grid is available, I want the battery to charged slowly (or not at all) at the set rate and the rest exported to the grid.
And when the grid is down, I want the battery to resume charging at max Solar utilization.
Reason behind feature request: Sometimes it happens that a power cut happens but the battery is already fully charged thus wasting PV.
@Luxpower_Gilbert You may want to take a look at this.