Hey guys. I just commissioned a 4.3kw ground array. Charge controller is the schneider 100 600. All is working great. However, my Orion Jr.2 BMS is not controlling the new charger controller even though it controls my Conext 60 150 just fine.
I have reached out to Orion to see if they are willing to modify my BMS profile so it will also control my new CC. They haven't responded to emails and I suspect I won't get any additional support from them. The owner and head tech guy assured me that he would create a profile for me that would control my Schneider equipment and he made good on that promise over two years ago. I don't know why he isn't responding when he was so responsive two years ago. I even offered to pay him for his time.
Is there a way to make the 100 600 CC go to standby mode when the 60 150 goes to standby? I have tried the "Echo" setting and the two charge controllers mimic each other when going from bulk to float, changing voltage settings, etc. But they do no mimic the standby state.
I'm pretty sick to my stomach that I won't be able to use my new array when I am away from the place.
Thanks for any advice.
I have reached out to Orion to see if they are willing to modify my BMS profile so it will also control my new CC. They haven't responded to emails and I suspect I won't get any additional support from them. The owner and head tech guy assured me that he would create a profile for me that would control my Schneider equipment and he made good on that promise over two years ago. I don't know why he isn't responding when he was so responsive two years ago. I even offered to pay him for his time.
Is there a way to make the 100 600 CC go to standby mode when the 60 150 goes to standby? I have tried the "Echo" setting and the two charge controllers mimic each other when going from bulk to float, changing voltage settings, etc. But they do no mimic the standby state.
I'm pretty sick to my stomach that I won't be able to use my new array when I am away from the place.
Thanks for any advice.