Hi, I have a SoyoSource grid tie inverter. The documentation shows that the CT clamp for monitoring must be after the injection of power for the inverters which must be between the grid and CT clamp. See page 2 here https://m.media-amazon.com/images/I/A1t+pOY1-ZL.pdf
Why would that be the case? I was going to shut send the power back through an open breaker spot but I have no way to make the power inject before the main panel.
is this documentation correct or does it actually mean that the CT clamp just has to go prior to the appliances the inverters are powering?