Have an EG4 12KW Hybrid (+15kw Li-iron-Phosphate batteries). Grid tied and net metering. The Solar inverter is a Fronius Primo. When in grid down and running on battery should I set the Fronius to Country code setting "MG6 N" to allow the EG4 to frequency shift and adjust the Fronius power output to match the needs of the load and battery charging? Normal code setting for the Fronius was "240 N". If I should change it, do I leave it set to MG6N during a grid up scenario or change it back to 240N? I have scoured Fronius documentation and have yet to find answers .... yet
It appears that the current 240N setting results in toggling the inverter off/on when the inverter has excess coupled AC when in "grid down"
TIA
It appears that the current 240N setting results in toggling the inverter off/on when the inverter has excess coupled AC when in "grid down"
TIA
Last edited: