liberumyu
New Member
- Joined
- Jul 2, 2022
- Messages
- 57
Hi all.
I will replace my EASUN 3P system soon with 2x Deye Hybrid Inverter 3 Phase 12K Inverter SUN-12K-SG04LP3-EU / Wifi and there is one thing which I cannot figure out from manual.
As I don’t have dedicated backup power wiring I was planning to run everything as backup load on Deye. Is this possible with grid on?
I will replace my EASUN 3P system soon with 2x Deye Hybrid Inverter 3 Phase 12K Inverter SUN-12K-SG04LP3-EU / Wifi and there is one thing which I cannot figure out from manual.
As I don’t have dedicated backup power wiring I was planning to run everything as backup load on Deye. Is this possible with grid on?