Can you explain what you mean here... if the inverter is connected to your supply, which is connected to the grid then DNO notification or approval is required, depending on inverter's output power.
Sorry, this is a hybrid thread, I should have stated this would be related to a non-hybrid inverter. I.e. the grid component is only there to feed a battery charger. If there were no transfer switch involved, there would be no physical AC connection possible in the system what-so-ever. From reading, the G98 is an *export* notification. If you cannot export, would you need to notify?